翻訳と辞書
Words near each other
・ Bundesautobahn 281
・ Bundesautobahn 29
・ Bundesautobahn 293
・ Bundesautobahn 3
・ Bundesautobahn 30
・ Bundesautobahn 31
・ Bundesautobahn 33
・ Bundesautobahn 352
・ Bundesautobahn 37
・ Bundesautobahn 38
・ Bundesautobahn 388
・ Bundesautobahn 39
・ Bundesautobahn 391
・ Bundesautobahn 392
・ Bundesautobahn 395
Bund Tunnel
・ Bunda
・ Bunda C. Chibwe
・ Bunda cliffs
・ Bunda de Fora
・ Bunda District
・ Bunda people
・ Bunda Station
・ Bunda Street
・ Bunda Town
・ Bundaberg
・ Bundaberg (disambiguation)
・ Bundaberg Airport
・ Bundaberg Base Hospital
・ Bundaberg Brewed Drinks


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Bund Tunnel : ウィキペディア英語版
Bund Tunnel

The Bund Tunnel () is a 〔(Shanghai ramps up efforts to improve Bund ). China.org.cn〕 sub-surface road and road tunnel in the city of Shanghai, China. The tunnel connects the districts of Hongkou to the north and Huangpu to the south.
In the south, the tunnel begins on a stretch of South Zhongshan Road, which runs along the western bank of the Huangpu River, on the east side of the old Chinese city. It follows South Zhongshan Road and No. 2 East Zhongshan Road, crosses Yan'an Road, a major east-west artery (with a major exit to and from Yan'an Road), then follows East No. 1 Zhongshan Road through the Bund. At the northern end of the Bund, where the surface road joins the historic Garden Bridge to cross Suzhou Creek, the tunnel also crosses Suzhou Creek under the bridge. On the northern bank of Suzhou Creek, the tunnel briefly follows Daming Road, with another major exit leading east onto Changzhi Road, while the main tunnel veers west and joins Wusong Road.
Construction on the tunnel began in 2007. The southern section of the tunnel is a subsurface road built using cut and cover methods, while the northern part was tunnelled using a shield method. The tunnel has two levels, with each level carrying three lanes of traffic in one direction.〔(公司承建的外滩通道南段工程从延安东路隧道上方成功穿越 ) (Southern section of the Bund Corridor Project contracted by the Company successfully passes over the East Yan'an Road Tunnel), Shanghai SGC Company Limited, 1 November 2009〕 The tunnel was opened on 28 March 2010.
==Replaced structures==
The construction of the tunnel was designed to relieve the heavy traffic through the Bund area. It rendered obsolete two late 20th century structures which had impacted the streetscape and sightlines in the Bund area, allowing them to be removed.〔(新外滩:时尚与经典 ) (New Bund: fasshionable and classic). ''Wenhui Bao''. 28 March 2010〕
The Bund Tunnel replaced the road transport function of the Wusong Road Gate Bridge over Suzhou Creek (and its water control function was replaced by the new Jinshan Road Gate). The concrete road bridge and flood gate, which was built to the west of Garden Bridge to relieve traffic from the historic bridge, was criticised for affecting the historic sightlines between Garden Bridge and landmarks further up Suzhou Creek (such as the General Post Office Building).〔(吴淞路闸桥明凌晨全面开拆 今后形成外滩源公园 ) (Wusong Road Gate Bridge demolition fully commences tomorrow morning; Will in future form "the Bund Origin" park). ''Morning News''. 16 October 2009〕 Wusong Road Gate Bridge was demolished in 2009, prior to the completion of the Bund Tunnel.
Additionally, instead of being directed to surface roads, traffic entering the Bund from Yan'an Road could now be directed underground into the Bund Tunnel. This made the large concrete ramp by which the Yan'an Elevated Road joined the Bund redundant. The ramp, along with a significant stretch of the elevated expressway, which had long impacted the streetscape near Yan'an Road's junction with the Bund, was demolished.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Bund Tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.